Case-Grainger: Reengineering the China/U.S. Supply Chain (p.457)
Case-Grainger: Reengineering the China Supply Chain (p.457) Please address the following. Evaluate the current China/Taiwan logistics costs. Assume a current total volume of 190,000 CBM and that 89% is shipped direct from the supply is plants in containers. Using the…